Stamping Dies/Sheet Metal Stamping/Automotive Sheet Metal Dies/Metal Stamping Dies

{Processing Date}: 35~45 days{Spare parts}: PUNCH, MISUMI and so on{Equipment}: 400T Punch{Produce equipment}: 315T Hydraulic machine/press, 400T\\200T\\160T Punch (With the belt feeding machine), 110T, 80T, 40T Punch equipment, Can meet the need of mass production and testing.{Service content}: Designing and manufacturing for m

Featured Products

{Processing Date}: 35~45 days
{Spare parts}: PUNCH, MISUMI and so on
{Equipment}: 400T Punch
{Produce equipment}: 315T Hydraulic machine/press, 400T\200T\160T Punch (With the belt feeding machine), 110T, 80T, 40T Punch equipment, Can meet the need of mass production and testing.
{Service content}: Designing and manufacturing for metal mould and products.
{Main customers}: Haier, Hisense, Midea, Siemens, Sanyo, Electrolux, Toyota, KIA, Foton, SGMW, SKYWORTH etc.
{Main export markets}: Japan, Korea, Thailand, Russia, Germany, Britain, Norway, Italy, Spain, Turkey; America, Brazil, Argentina; South Africa Egypt; Iran, Pakistan, India etc...
{Mold paint}: Painting color depends on customer requirements
(Packaging: Wooden case)
PRODUCTION PROCESS:
Stamping Die/Sheet Metal Stamping/Automotive Sheet Metal Mold/Metal Stamping Tooling
The first trial success rate is above 95%
{Quotation time}: We will quote in 24 hours after receiving the customer's drawings.
{Data needed to offer}: 2D/ 3D drawing or samples
{Quotation}: Including the accurate price/stage/life and process time.
{The profile}: 2D/3D drawing or samples
{Project Manager}: Concentrate on project tracking and after service
{Engineer}: 30-50 excellent engineers, have many years experience and English communicate well.
{Warehousing and logistics}: The purchase department use EPR system to make sure buying materials in time.
{Fitter technician}: 100-130 experienced workers can meet the customer request of batch production.
{Quality department}: 15 members quality control workers, measuring the mould and parts by CMM and projector.
{Domestic delivery}: Logistics transportation
{Delivery to overseas}: FOB/CIF/DDU by sea shipping or air shipping

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours